Today's Inspections

 
PERMITADDRESSINSPECTIONINSPECTORTIMERESULTCOMPLETED
Data pager
Page size:
PageSizeComboBox
select
 69 items in 4 pages
150 JOHNSON ST**PROJECT FINALDan Burns10:00 AMFAILED10/26/202110:00 AM
1576 HAMMONTON-SMARTSVILLE RDPLUMBING TOPOUTDan BurnsTBDPASS10/26/2021 
1576 HAMMONTON-SMARTSVILLE RDROUGH ELECTRICALDan BurnsTBDPASS10/26/2021 
1576 HAMMONTON-SMARTSVILLE RDROUGH MECHANICALDan BurnsTBDFAILED10/26/2021 
1576 HAMMONTON-SMARTSVILLE RDROUGH PLUMBINGDan BurnsTBDPASS10/26/2021 
1576 HAMMONTON-SMARTSVILLE RDINSULATE (ROOF/WALL)Dan BurnsTBDPASS10/26/2021 
11145 LOMA RICA RD**PROJECT FINALDan BurnsTBDPASS10/26/2021 
4173 CITATION DRGAS TESTDan BurnsTBDPASS10/26/2021 
4173 CITATION DRTAG NATURAL GASDan BurnsTBDPASS10/26/2021 
1576 HAMMONTON-SMARTSVILLE RDROUGH FRAMEDan Burns12:30 PMPASS10/26/202112:30 PM
1941 PINEWOOD WAY**PROJECT FINALDan Burns12:00 PMCANCELLED10/26/202112:00 PM
11145 LOMA RICA RDFIELD INSPECTIONDan Burns1:30 PMPASS10/26/20211:30 PM
1354 JASON DR**PROJECT FINALDan Burns10:30 AMPASS10/26/202110:30 AM
1752 KARTIKEYA AVE**PROJECT FINALDan Burns11:00 AMPASS10/26/202111:00 AM
1941 PINEWOOD WAY**PROJECT FINALDan BurnsTBDPASS10/26/2021 
1338 CALLISON WYOPUD FINAL TBDPASS10/26/2021 
783 ANNADEL CTOPUD FINAL TBDPASS10/26/2021 
791 ANNADEL CTOPUD FINAL TBDPASS10/26/2021 
786 ANNADEL CTOPUD FINAL TBDPASS10/26/2021 
1055 SANTA BARBARA WAYOPUD FINAL TBDPASS10/26/2021 
 

    **NOTICE**                                                           

Inspection times listed above are set each morning by 8:30am. Times listed are estimated
and are subject to change without notice.  Inspectors may arrive up to 1-hour prior or 1-hour later that the posted time.